  • Daily Report of Important Reservoirs of Madhya Pardesh Water Resources Department

Report as on 05/07/2022
Water Level of Important Reservoirs
(as per sms based reservoir level monitoring system)


Note: Recorded value with * sign indicates it is not current date reading.
Recorded value with Red color is below L.S.L.

S.No.

Name of Reservoir

Location
District

River

LSL
(In M)

FRL
(In M)

Live
Capacity at
FRL
(In MCM)

Reservoir Level/Capacity

This Season 05/07/2022

Last Season 05/07/2021

Level
(In M)

Live cap.
(In MCM)

% of Live capacity
as on 05/07/2022

Level
(In M)

Live cap.
(In MCM)

% of Live capacity
as on 05/07/2021

1

2

3

4

5

6

7

8

9

10

11

12

13

Chief Engineer BODHI, Bhopal

1. Indira Sagar Project [40772]  Khandwa Narmada 245.13 262.13 9750 247.09 1130.00 11 246.37 889.08 9
2. Omkareshwar Project [40771]  Khandwa Narmada 193.54 196.60 299 193.82 195.21 163.17 54
3. Rani Awanti Bai Sagar (Bargi) [10970]  Jabalpur Narmada 403.50 422.76 3180 412.70 1016.60 31 415.15 1378.50 43

Chief Engineer Chambal Betwa Basin, Bhopal

4. Gopikrishn Sagar [10119]  Guna Gopannala 421.00 434.00 78.1 430.08 40.27 51
5. Sagad Dam [11286]  Vidisha Sagad 448.05 455.64 75.72 450.20 12.77 16
6. Samrat Ashok Sagar (Halali) [10090]  Vidisha Halali 448.95 459.61 252.13 454.53 56.63 22 454.29 51.30 20
7. Sanjay Sagar(Bah) Project [20811]  Vidisha Bah River 440.50 448.20 76.52 441.79 5.05 6

Chief Engineer Dhasan Ken Basin, Sagar

8. Bila Tank [10276]  Sagar Bila 434.64 445.61 51.95 433.88 432.20
9. Pagra Tank (Feeder) [28178]  Sagar Bewas River 433.04 445.02 94.04 440.80 40.00 42 442.05 53.23 56
10. Rangawan Dam [20734]  Chhatarpur Banne River 219.76 233.17 155.19 66.96 220.55 2.20 1
11. Urmil Dam [20723]  Chhatarpur Urmil River 228.29 237.43 113.92 228.00 227.00

Chief Engineer Ganga Basin, Rewa

12. Bansagar Dam [10969]  Shahdol Sone 323.10 341.64 5429.6 334.18 2266.92 41 333.92 2191.45 40
13. Mahan Dam [10407]  Sidhi Mahan River 307.00 325.00 149.76 320.28 77.26 51 320.68 82.33 54

Chief Engineer Narmada Tapti Basin, Indore

14. Dejla Dewda Tank [10696]  Khargone Kunda 369.56 383.20 50.29 371.60 4.17 8 372.00 5.10 10
15. Mahi Main Dam [10852]  Jhabua Mahi River 441.00 451.50 135.6 441.00 0.00 0 440.65 0.000 0
16. Sukta Tank [10686]  Khandwa Sukta 399.59 410.56 78.08 405.17 37.10 47

Chief Engineer Rajghat Canal Project, Datia

17. Bansujara Major Project [33147]  Tikamgarh Dhasan 302.50 316.50 276.09 309.80 60.70 21
18. Madikheda Dam [20878]  Shivpuri Sindh 320.05 346.25 834.83 336.75 369.76 44
19. Mohini Pick up Weir [31410]  Shivpuri Sindh 263.95 276.25 107.11 272.25 47.17 44 268.40 16.30 15
20. Rajghat Dam [21552]  Ashoknagar Betwa 356.62 371.00 1973 364.10 738.00 37 359.35 194.00 9

Chief Engineer Wainganga Basin, Seoni

21. Bawanthadi (Rajiv Sagar) [10515]  Balaghat Bawan Thadi River 333.50 344.40 254.68 337.70 54.75 21 340.10 105.57 41
22. Bilgaon Medium Project [20760]  Dindori Silgi 690.50 701.00 58.12 698.05 39.67 68
23. Chhitakhudri Medium Project [42516]  Jabalpur Chhoti Mahanadi 566.50 592.00 74.93 569.00 2.26 3
24. Matiyari Dam [10571]  Mandla Matiyari 484.00 497.43 51.09 493.83 29.95 58
25. Pench Diversion [20761]  Chindwara Pench 613.40 625.75 421.2 617.80 102.81 24 617.91 105.95 25
26. Thanwar Dam [10570]  Mandla Thanwar 470.00 481.10 123.53 473.10 19.97 16 474.57 34.36 27
27. Wainganga (Sanjay Sarovar) [10516]  Seoni Wainganga 506.27 519.38 410 508.70 45.09 10 511.55 113.09 27

Chief Engineer Water Resources Department, Ujjain

28. Datuni Medium Tank [33110]  Dewas Datuni 343.00 360.00 49.13 343.35 0.28 0 348.60 7.50 15
29. Dholawad Tank [10659]  Ratlam Jhamad 380.00 395.00 49.94 383.60 5.15 10 383.85 5.58 11
30. Gandhisagar Dam [10645]  Mandsaure Chambal 381.00 399.89 6607.42 394.81 3832.24 57 393.15 3114.91 47

Chief Engineer WRD, Hoshangabad

31. Barna Dam [10965]  Raisen Barna 338.10 348.55 455.8 343.11 143.46 31 344.72 219.43 48
32. Kolar Dam [10966]  Sehore Kolar 432.93 462.20 265 448.36 74.83 28 451.24 104.51 39
33. Parasdoh Tank [39183]  Betul Tapti 623.85 639.10 69.82 637.06 49.87 71 633.80 27.24 39
34. Tawa Dam [10962]  Hoshangabad Tawa 336.80 355.39 1944.18 104.16 342.53 331.59 17

Chief Engineer Yamuna Basin, Gwalior

35. Harsi Dam [10204]  Gwalior Parwati 252.06 264.93 192.67 262.34 131.67 68 258.89 65.55 34
36. Kaketo Dam [10203]  Gwalior Parwati 320.19 342.74 79.12 338.90 50.24 63 337.85 43.76 55
37. Kotwal Tank [10178]  Morena Asan 164.65 168.39 57.45 167.52 42.17 73 167.27 37.86 65
38. Mahuar Dam [20771]  Shivpuri Mahuar 317.00 331.00 65.03 324.42 26.64 40 320.38 9.22 14
39. Pagara Tank [10176]  Morena Asan 182.88 199.33 120.54 191.56 29.07 24 187.45 8.25 6
40. Tigra Dam [10205]  Gwalior Sank 211.83 225.55 124.29 222.03 65.51 52 219.60 37.78 30
41. Upper Kaketo Dam [20832]  Sheopur Parwati 363.00 370.00 52.24 364.95 5.18 9 362.80 0.000 0

Project Director, MKPMU, Rajgarh

42. Kundalia Major Project [40810]  Rajgarh Kalisindh 380.00 400.00 552.8 388.10 81.99 14 389.40 106.22 19
43. Mohanpura Multipurpose Project [38931]  Rajgarh newaj 377.05 398.00 572.96 390.10 190.79 33
Highcharts Example
Filling percentage No. of Tanks as on 05/07/2022
Less than 10%12
10% to 25%11
25% to 50%11
50% to 75%9
75% to 90%0
More than 90%0

Total

43