WATER RESOURCES DEPARTMENT - EIMS REPORT

COMPLETED MINOR SCHEMES YEAR 2013-14

S.No.
Scheme Name
District
Estimated Cost(Lakh)
Completion Cost(Lakh)
Funding Head
Completion Year
Design Irrigation (Ha)
Purpose
Type of Structure
Rabi
Kharif
Other
Total
Chief Engineer WRD, Hoshangabad >> Water Resources Circle Betul
Water Resources Division No.2 Betul
1 Gunghati Tank [28520] Betul 495.11 0 AIBP 2013 423 193 0 616 Irrigation Earthen Dam
2 KAUDI [32078] Betul 455.18 0 AIBP 2013 265 0 0 265 Irrigation Earthen Dam
3 Koudiya [32541] Betul 382.53 0 AIBP 2013 262 0 0 262 Irrigation Earthen Dam
Water Resources Division Multai
4 Bakud Tank [10938] Betul 1096 0 2013 1101 356 0 1457 Irrigation Earthen Dam
5 Kapasiya [28031] Betul 71.92 0 Plan 2013 81 20 0 101 Irrigation Earthen Dam
6 KARPA [32176] Betul 298.81 0 AIBP 2013 180 0 0 180 Irrigation Earthen Dam
7 MATHANI [32177] Betul 710 0 AIBP 2013 683 0 0 683 Irrigation Earthen Dam
8 PABAL [32179] Betul 316.2 0 AIBP 2013 240 0 0 240 Irrigation Earthen Dam
9 RIDHORA [32181] Betul 308.68 0 AIBP 2013 230 0 0 230 Irrigation Earthen Dam

Total

3465

569

0

4034