WATER RESOURCES DEPARTMENT - EIMS REPORT

COMPLETED MINOR SCHEMES YEAR 2012-13

S.No.
Scheme Name
District
Estimated Cost(Lakh)
Completion Cost(Lakh)
Funding Head
Completion Year
Design Irrigation (Ha)
Purpose
Type of Structure
Rabi
Kharif
Other
Total
Chief Engineer Ganga Basin, Rewa >> Water Resources Circle Shahdol
Water Resources Division No.2 Shahdol
1 Bandhwatola [27287] Shahdol 0 0 AIBP 2012 150 90 0 240 IRRIGATION Earthen Dam
2 Mithori Dam [10405] Shahdol 0 0 2012 245 200 0 445 Irrigation Earthen Dam
Water Resources Division Anuppur
3 Chhirhatola [26464] Anuppur 0 0 AIBP 2012 70 0 0 70 IRRIGATION Earthen Dam
4 Chhulakari [23746] Anuppur 0 0 2012 67 203 0 270 IRRIGATION EARTHEN_DAM
5 Karpa [23240] Anuppur 0 0 AIBP 2012 225 125 0 350 IRRIGATION Earthen Dam
6 Nanghati [23884] Anuppur 0 0 AIBP 2012 240 50 0 290 IRRIGATION Earthen Dam
Water Resources Division, Umaria
7 Baruha [26034] Umaria 0 0 2012 563 120 0 683 IRRIGATION Earthen Dam
Chief Engineer Ganga Basin, Rewa >> Bansagar Canal Circle Rewa
Water Resources Division Satna
8 AMRANALLA [22104] 0 0 MPWSRP 2012 40 81 0 121
Upper Purwa Canal Division Rewa
9 Belha Tank [39080] Rewa 38.96 450 Plan 2012 518 82 41 641 Irrigation Earthen Dam
10 Gobardaha [30372] Rewa 0 0 2012 108 0 0 108 Irrigation Earthen Dam
11 Rakri [30375] Rewa 0 0 2012 81 0 0 81 Irrigation Earthen Dam
Teonthar Canal Division Sirmour, Rewa
12 Chhadahana [30374] Rewa 0 0 2012 91 0 0 91 Irrigation Earthen Dam

Total

2398

951

41

3390


Powered by © Water Resources Department (MP). All Rights Reserved.